0
votes
0answers
39 views

Using object flow and control flow in UML

I have a UML activity diagram below, where there are two ways are shown in which actions can be done. Since the setting of values of a and b can be done any order before the action 2 is executed ...
0
votes
0answers
35 views

How to model an optional input to an activity?

I am constructing a UML 2.0 activity diagram. The activity is to evaluate data from a usability study of a prototype. It can optionally end with just getting the user satisfaction results. But if the ...
1
vote
0answers
105 views

UML activity diagram: How to end activity after Event Signal Action?

To my knowledge, event signal actions are not allowed to have output control flow, so how can I model the end of an activity after a event signal action? The same issue arises for accept event actions ...
2
votes
3answers
997 views

Do activity diagrams always end in one endpoint?

For example an activity diagram for a simple program: Get User data. If User Exists DO something, ELSE do nothing. End. I often see diagrams with multiple endpoints but also with just one. Should ...
1
vote
2answers
378 views

Activity diagram, can merge node have more than 1 output?

There is a simple system, that allows users to do 4 things: ADD, EDIT, DELETE, PRINT data. I am due to model it (I'm entirely new to UML activity diagrams) and from notation, I dont understand ...
0
votes
1answer
278 views

How to construct UML activity diagram reflecting real programmed source code as docs

Please, tell me the things I must use for modeling an (Enterprise Architect) activity diagram of object1.method1() calls object2.method2() I'm able to dragndrop a method of a class from model ...
2
votes
2answers
2k views

how to express alternative flows in activity diagram

I want to express the below events in an activity diagram: An alternative flow, such as "at step x of basic flow, user clicks cancel instead of ok". An alternative entry to the use case, such as ...