1
vote
0answers
94 views

UML activity diagram: How to end activity after Event Signal Action?

To my knowledge, event signal actions are not allowed to have output control flow, so how can I model the end of an activity after a event signal action? The same issue arises for accept event actions ...
0
votes
3answers
420 views

Do Activity diagram end in one endpoint anyway?

For example an activity diagram for a simple program - Get User data. If User Exists DO something, ELSE do nothing. Then End. In the activity diagram, do I merge both ways to one final state, ...
1
vote
2answers
263 views

Activity diagram, can merge node have more than 1 output?

There is a simple system, that allows users to do 4 things: ADD, EDIT, DELETE, PRINT data. I am due to model it (I'm entirely new to UML activity diagrams) and from notation, I dont understand ...
0
votes
1answer
209 views

How to construct UML activity diagram reflecting real programmed source code as docs

Please, tell me the things I must use for modeling an (Enterprise Architect) activity diagram of object1.method1() calls object2.method2() I'm able to dragndrop a method of a class from model ...
2
votes
2answers
2k views

how to express alternative flows in activity diagram

I want to express the below events in an activity diagram: An alternative flow, such as "at step x of basic flow, user clicks cancel instead of ok". An alternative entry to the use case, such as ...